Tender Notice for Purchasing and Installation of LED Lighting Fixtures

Title: LED Lighting Fixture Procurement and Installation Project Tender Notice Tender No.: Announcement Date: June 5, 2009 Deadline: June 12, 2009 Tendering Agency: Anhui Transportation Investment Group Co., Ltd. Province: Anhui Province - Hefei City Content: The Anhui section of Lu'an-Wuhan Expressway has been approved by the Ministry of Communications of the People's Republic of China [2005] No. 366 and has been included in the Anhui Province's transportation infrastructure plan. Anhui Transportation Investment Group Co., Ltd. (hereinafter referred to as “Tenderee”) is currently conducting domestic public bidding for the procurement and installation of LED lighting fixtures for the Anhui section of the Lu'an-Wuhan Expressway (hereinafter referred to as “the project”).

First, the tendering method:

The project is divided into two contract packages, open tendering and post-qualification review.

Second, the scope of the tender:

The project includes the procurement and installation of five tunnel LED lighting fixtures such as Yaowan. The total length of the tunnel is 17112m, and the lamps are divided into 50W and 100W. The contract package is divided as follows:

Contract package

Single hole length (m) main project
LED-01ZK22+077~ZK65+779

YK22+124~YK65+8237815 Yaowan Tunnel, Nanling Tunnel, Liji No. 1 Tunnel LED Lighting
LED-02ZK31+190~ZK37+587

YK31+185~YK37+6089297 Xinkailing Tunnel, Wangzhuyuan No. 2 Tunnel LED Lighting

Third, qualification requirements:

1. The bidder shall be a manufacturer of lighting fixtures with the qualifications of urban and road lighting engineering contractors and above, or a general contractor (bidder) with lighting fixture manufacturers, and a joint venture with urban and road lighting engineering. An installation unit that is qualified for the above grades and above;

2. The registered capital of the lighting fixture manufacturer is not less than RMB 20 million;

3. Lighting fixture manufacturers must pass ISO9000 series quality management system certification;

4. The bidder has the performance of manufacturing and application of tunnel LED lighting.

Fourth, technical requirements:

1. The luminaire is of the rated power (specified as the rated power of the LED) 50W, 100W two types.

2. The LED light source used in the lamp must be a single-chip high-power white light product of international famous brand. Under the condition of constant current supply of 350mA, the forward voltage of a single LED should be controlled between 3~4V, and the luminous flux should be no less than 100 lm. .

3. Under normal working conditions, the measured junction temperature of the LED is ≤80°C.

4. Under normal working conditions, the LED light source should not be greater than 30% of the initial value after 50000h. The LED service life calculated by this standard should be no less than 50,000 hours.

5. Modular design: 1 Tunnel LED lighting adopts constant current power supply mode, the service life of power supply should be no less than 20000h; 2 power supply adopts modular type with rated power 50W; 3 one power supply drives a modular series circuit or A modular series-parallel circuit; 4 lamps and LED circuits use a standard modular version of 50W based on rated power and organization.

6, road tunnel LED lighting fixtures in the -25 ° C ~ +55 ° C working environment temperature and AC170V ~ 280V working voltage should ensure normal operation.

7, power efficiency: ≥ 85%.

8. Power factor: ≥0.95.

9. The protection level of tunnel LED lighting fixtures should be no less than IP65;

10, single lamp output luminous flux: 50W ≥ 2750 lm, 100W ≥ 5500lm.

11. The longitudinal and lateral light exit angle of the lamp is controlled between 75° and 90°.

12, the rated power of the lamp: the deviation is controlled within the range of 0~ +10%.

13, 100W tunnel LED lighting fixtures must have stepless dimming control function, the power supply in the 0~5V voltage signal range, to achieve 0~100% control of the brightness of the lamp. The brightness of 50W lamps is regulated by 50W and 35W on the power supply.

V. Construction period requirements:

The supply, installation and commissioning time of tunnel LED lighting for this project is from July 2009 to November 2009, and the planned construction period is 5 months.

6. Bidders who meet the above conditions may send a copy of the original copy of the business license, the original ISO9000 series quality management system certification certificate, the original or copy of the installation qualification certificate, the original LED lighting fixture manufacturing and application performance (supply and installation contract agreement) The book, the unit introduction letter, the manager's ID card and other supporting materials from June 4th to June 5th, June 8th to June 10th, every day from 8:30 to 11:30, 14:30~ 17:30 (Beijing time) to the construction management department of the second floor of Anhui Transportation Investment Group Co., Ltd., No. 1157, Changjiang East Road, Hefei (4) Registration and purchase of bidding documents and bidding drawings (each set is priced at RMB 1,000, after sale Retired), expired will not be accepted.

Seven, on-site inspection and pre-standard meeting

On-site inspection: The bidder will conduct the inspection on his own, and the tenderee will provide necessary assistance.

The on-site inspection can be contacted with the Construction Office of Liuwu Expressway of Anhui Transportation Investment Group Co., Ltd.

Pre-bid meeting: no pre-bid meeting.

Bidders are requested to submit the questions to be clarified in writing to the tenderee before 17:00 on June 12, 2009. All questions will be answered by the numbered supplement before 17:00 on June 16, 2009. The bidder shall be notified that the bidder shall reply to the tenderee in writing within 24 hours after receiving the addendum.

Eight, bid documents, two specifications of LED lighting samples (50W, 100W each set, must be packaged separately, and indicate the bidder's unit name, specifications on the outer packaging) submitted on June 23, 2009 8: 30~10:00 (Beijing time), submitted to the conference center on the second floor of New Great Wall Hotel, No. 283 Chaohu Road, Hefei. It is scheduled to be open at 10:00 (Beijing time) on June 23, 2009 at the same place where the bid documents are submitted. The bidder shall send the legal representative or his authorized agent to attend on time, otherwise it will be regarded as the default opening result.

The bidder must submit the original letter of commitment (see the attachment of this tender notice) when submitting the sample of the lamp, and submit a sample test fee of RMB 5,000. The tenderee will entrust a testing institution with corresponding qualifications to test the samples, and the testing fee will not be refunded. After the bidding of this project is completed, the samples of the lamps that have not been won by the bidder will be collected by the bidders themselves. The samples of the lamps of the winning bidders will not be returned, and will be reserved for the comparison of the lamps in the delivery process.

9. When submitting the bidding documents, the bidder shall submit a bid guarantee of RMB 10,000 per contract package as required. The bidding guarantee must be transferred to the bank account designated by the tenderee before 10:00 am on June 22, 2009, and submitted to the Finance Department of the third floor of Anhui Transportation Investment Group Co., Ltd., No. 1157, Changjiang East Road, Hefei City. 2) Receive the payment credentials and bring the credentials to submit the bid documents. Company Name: Anhui Communications Investment Group Co., Ltd. Contact: Yang Mupan Tel: 0551-4298902 E-mail: Fax: 0559-4296086 Postal Code: Address: No. 1157, Changjiang East Road, Hefei, Anhui, China