In order to facilitate our new customers to learn LED indoor screen assembly, the following guidelines are given. We hope that our customers will benefit and will provide you with LED products from time to time.

1. After assembling the aluminum profile, ie the outer frame, we first install the display unit board in the order from right to left and from bottom to top. The height and flatness of the unit plate can be adjusted by the four-corner disk nut.

2, to complete the above steps, we must prepare to install the switching power supply: hand drill according to the switch power supply installation hole position drill φ3.2 hole, with self-tapping screws to fix.

3. Connect the unit board display screen with 16P cable in the order from right to left.

4. Connect the 5V power cable of the switching power supply to the power socket of the unit board. Note that the positive and negative polarity of the power supply cannot be reversed.

5. Installation of display card and sending card: Remove the computer case, press the corresponding display socket to install the display card and sending card of the LED display, and fix it with screws. Connect the display card and the sending card with a flat cable.

6. Installation of the receiving card: Install the receiving card at the appropriate position on the right side of the LED display frame, and connect the power supply and the signal line between the receiving card and the unit board.

7. Connect the sending card and the receiving card with five types of twisted pair cables (communication lines).

8. Check if the switching power supply is shorted.

A. Use the resistance of the digital multimeter (200Ω) to measure the resistance between the positive and negative terminals of the switching power supply. The resistance range is between 30~40Ω.

B. Unplug the power plug between the switching power supply and the unit board. Add 220V voltage to the switching power supply and measure the voltage value as +5V±0.2V.

LED indoor display debugging

Start LED screen test software

1. Walk the full screen with a crosshair and check for uncontrolled points and associated points.

2. Test with horizontal, vertical and diagonal lines respectively.

3, full screen lighting, check blind spots, lack of color points.

4. Perform color test on the color screen and check the gray level.

Observe the large-screen work. If there are any problems, solve them one by one according to the phenomenon. For specific methods, see common faults and maintenance.