Installation Environment
1. The ideal placement environment is at a temperature of 20°C (68°F) and a humidity level of 50% for optimal performance.
2. Avoid placing the device in areas exposed to direct sunlight, vibrations, wind, dust, or magnetic fields that could interfere with its operation.
3. Ensure the voltage being used matches the model’s required specifications to prevent damage or malfunction.
â–¼ Install the draft shield and place the unit inside it to ensure stability and protection from environmental factors.
â–¼ Level Adjustment
Use the adjustable feet to level the machine. Adjust until the bubble in the spirit level is centered within the black circle, ensuring the entire unit is perfectly level.
â–¼ Sink Installation
Pour distilled water into the water tank up to the top of the four frosted lines on the tank. Wipe away any excess water around the tank, then place it into the two concave grooves on the main unit.
â–¼ Measuring Station Installation
Place the measuring table onto the measuring plate, aligning the four projections of the table with the corresponding grooves on the plate. Make sure the hanging bar is fully submerged in the water and does not touch the sink itself.
Proper installation and setup are crucial for the accurate and reliable performance of the equipment. Following these steps carefully will help ensure long-term stability and precision in your measurements.
Tinned Copper Clad Steel,Professional Tinned Copper Clad Steel,Heat-Resistant Tinned Copper-Clad Steel,Tinned Copper Clad Steel Metal Wire
changzhou yuzisenhan electronic co.,ltd , https://www.ccs-yzsh.com